Does the painting process require the design of a levelling chamber?
1. Adopt manual and no-line painting method: Zhongyuan Coating Recommendation: Put the sprayed product in a dust-free environment for 5~10 minutes (this is called cold flow) and then put it into the fixed oven for baking. Generally, the ordinary one-component paint is baked. In about 15 minutes, the two-component paint should be baked for 30~45…
Details